Van Ninh General Port

Location: Quang Ninh Province, Vietnam.

Total area: Van Ninh General Port and the port connecting road are divided into two development phases, in which:
Phase 1 (2019 - 2020): construction of 02 berths for 20,000DWT vessels with total berth length of 500m, dredging of water basin, handling equipment and technical infrastructure equipped on the area of about 25 ha, port connecting road with a length of about 4 km
Phase 2 (2020 - 2022): construction of 06 berths for 20,000DWT vessels with total berth length of 1,500m, dredging of water basin, handling equipment and technical infrastructure.

Our services include:

  • Topographic and Hydrographical Survey
  • Soil Investigation
  • Detailed Planning 1/500; Feasibility Study, Basic Design and Detailed Design