FHS Son Duong Port

Client/Owner: Formosa Ha Tinh Steel Corporation (FHS).

Location: Vung Ang Economic Zone in Ha Tinh Province, Vietnam.

Main Investor: (Formosa Plastics Group, China Steel, JFE Steel).

Total area: Son Duong Port and Integrated Steel Mill Complex is currently the biggest FDI project in Vietnam and will be expected to become the biggest integrated steel mill in Southeast Asia in the future. FHS is investing USD 10.5 billion in the first phase of the project. Son Duong port which has capacity 28 Million Tons Cargo Handling, with Port Functions:
Harbour Area: 930ha; Breakwater has a total length of 5,243m.
Harbour Approach Channel: 9,000m has a depth of 23.5m Total number of wharves is 32 wharves and investment in 2 phases:
- Phase 1: 11 wharfs (2 wharves for 200,000DWT vessels and 9 wharves 10,000-50,000DWT vessels).
- Phase 2: 32 wharves (6 wharves for 200,000-300,000DWT vessels, 20 wharves for 30,000-50,000DWT vessels and 6 wharves for 10,000DWT vessels).

Our services include:

  • Topographic Survey; Hydrographical Survey; Geotechnical Survey; Geophysical Survey; Hydrological Survey; Mathematical Modeling; Feasibility Report (Phase 1 & Phase 2) in year 2008 - 2010
  • Planning Preparation; Detailed Planning & Detailed Design of Son Duong Port (Phase 1) with International Partner CECI Engineering Consultants.Inc. (Taiwan - China) in year 2009 - 2013
  • Hydrographical Survey in 2016 - 2017
  • Settlement Monitoring in 2018 - 2020