Inspection and verification of structure Upgrading of Interflour port

Interflour Port - 22/06/2020

Inspection and verification of structure Upgrading of the existing 75,000 DWT Berth for maximum berthing capacity of Interflour port.

Inspection and verification of structure Upgrading of Interflour port
HSE training work
Inspection and verification of structure Upgrading of Interflour port
Inspection of the concrete’s strength of beams using rebound hammer
Inspection and verification of structure Upgrading of Interflour port
Inspection of the concrete’s strength of beams using ultrasonic equipment
Inspection and verification of structure Upgrading of Interflour port
Inspection of the concrete Longitudinal beam defect by ultrasonic equipment
Inspection and verification of structure Upgrading of Interflour port
Inspection of geometrical dimensions of Transversal beam
Inspection and verification of structure Upgrading of Interflour port
Inspection of geometrical dimensions of pile
Inspection and verification of structure Upgrading of Interflour port
Inspection of slab thickness

Checking and determining the structure of Interflour's Port

Cai Mep Port - 22/06/2020

Checking and determining the capacity of the Port's structure, and upg...

A Meeting at Ba Ria - Vung Tau People’s Committee Office

Ba Ria Vung Tau People's Committee - 11/06/2020

Portcoast held a meeting to present “Zoning Plan having scale of 1/200...

REACTEC’s Visit to Portcoast

Portcoast - 10/06/2020

REACTEC paid a visit to Portcoast’s office and experienced its new tec...