Duyen Hai 1 Thermal Power Plant
Coal Import Terminal (1,245MW)

Owner: GENCO 1 - EVN.

Location: Tra Vinh Province, Vietnam.

Scale: The coal import terminal consists of a conveyor trestle (933.5 m long and 21.7 m wide), two coal import berths (each 190 m long and 21.7 m wide) for bulk carriers up to 30,000 DWT, and one oil berth for tankers up to 1,000 DWT. The project also includes a northern breakwater (3.9 km long), approach channel, turning basin, and other related civil works.

Consulting services:

  • Topographic survey; Geotechnical investigation; Hydrographic and hydrological survey.
  • Feasibility Study and Basic Design.
  • Environmental Impact Assessment (EIA) Report.
  • Tender document preparation and Bid evaluation.
  • Design verification and Construction supervision.