Rach Gia Cruise Terminal

Client/Owner: Kien Giang Provinceʼs Management Board for Transport Works.

Location: Kien Giang Province, Vietnam.

Total area: Rach Gia passenger port is planned with land area and water surface about 34.96ha. Construction items include dock, ferry terminal, train station, parking lot, parking lot commercial, shophouse, internal roads, technical infrastructure. Port will be calculated, designed to meet Approved by the expected number of passengers about 1,280,000 by 2020 and about 2,320,000 in 2030.

Our services include:

  • 2016 - 2017: Topographic & Hydrographical Survey; Geotechnical Investigations; Detailed Plan with the scale of 1/500.
  • 2019: Topographical Survey; Soil investigation; Feasibility Study